x
  • Thursday, 07/05/2026
  • Gallery
  • Video
English Tiếng Việt
Good88 hiện đang mở
Trang Chủ Nhà Cái Good88.com Không Chặn 2025
  • Email

    [email protected]

  • Contact us
  • About Us
    • Over View
    • Organization Chart
    • President's Letter
    • History
    • IC M Good88 link
    • Research strategy
  • Research & Development
    • Facilities
    • R&D Today
  • News
    • M Good88 link's News
    • S&T's News
    • Conference - Workshop
    • Chuyên mục: General News
    • Weekly Construction
  • Research
    • Biotechnology
    • Electronics
    • Environmental Technology
    • Information Technology
    • IT - BT
    • Advanced Materials
    • Biomedical Engineering
    • Food Technology
  • Careers
    • Career at M Good88 link
    • Capacity building programs
  • International Cooperation
  • Legal Documents
    • Documents
Good88 hiện đang mở
Trang Chủ Nhà Cái Good88.com Không Chặn 2025
Good88 hiện đang mở
Trang Chủ Nhà Cái Good88.com Không Chặn 2025

Contact Info

  • (+84) 243 556 0595
  • [email protected]

1109/2019

Construction updated September 10, 2019

  • Home
  • /
  • News
  • /
  • Weekly Construction
  • 4552 views
Construction updated September 10, 2019

Installing rebar and formwork of remaining 3rd floor slab and 4th floor slab of MB, RB1. Completed casting concrete 4th floor slab, Installing rebar and formwork of roof slab of RB2. Installing rebar and formwork of 4th floor slab of RB3.

Source: M Good88 link
  • Tags: 
  • Weekly Construction , 

VIDEO

2022 New Year Wishes from President Kum Dongwha

2022 New Year Wishes from President Kum Dongwha

M Good88 link - A DESTINATION OF THE WILL AND DREAMS OF SCIENTISTS

M Good88 link - A DESTINATION OF THE WILL AND DREAMS OF SCIENTISTS


Older Related Posts

Construction update Jan 29, 2021

2901/2021

Construction update Jan 29, 2021

The structure, architecture, building electromechanical system, landscape and outdoor infrastructure are basically completed.

View detail
Construction update Dec 29, 2020

2201/2021

Construction update Dec 29, 2020

The exterior of main building and researcher buildings are basically completed. Tile, doors, plasterboard ceiling ...are being installed inside the building. The M&E technical system of the building is being installed synchronously all the floor.

View detail
Construction updated November 12, 2019

2611/2020

Construction updated November 12, 2019

Installing rebar and formwork of 4th floor column and 5th floor slab of MB, RB1. Installing rebar and formwork of technical roof slab of RB2. Installing rebar and formwork of roof slab of RB3.

View detail
Construction update Oct 29, 2020

2910/2020

Construction update Oct 29, 2020

The exterior of main building and researcher buildings are basically completed. Tile, doors, plasterboard ceiling ...are being installed inside the building. The M&E technical system of the building is being installed synchronously all the floor.

View detail

PARTNER

Good88 hiện đang mở
KIST
KOICA
R&D Today
HHTP
Good88 hiện đang mở
Trang Chủ Nhà Cái Good88.com Không Chặn 2025
  • Khu Công nghệ cao Hòa Lạc, km29 Đại Lộ Thăng Long, Hà Nội
  • Điện thoại: 02435560595
  • [email protected]

Hệ thống thông tin

Gôd88 nhà cái uy tín
44Good88 cok giải trí
Lĩnh vực Goodd88 game bài, casino online, bắn cá, nổ hũ
Tin tức

Tìm hiểu thêm

  • Về chúng tôi
  • Hệ thống văn bản
  • Tuyển dụng và đào tạo
  • Thư viện ảnh
  • Video
  • Liên hệ

Good88 Thiên đường trò chơi điện tử top 1 Châu Á - Uy tín © 2024